Sign In | Join Free | My enlightcorp.com |
|
Brand Name : Lebron-Machinery
Model Number : Door Frame Roll Forming Machine
Certification : ISO 9001: 2008
Place of Origin : Wuxi, Jiangsu, China
MOQ : 1 Set
Price : USD10000~20000 per Set
Payment Terms : L/C, T/T
Supply Ability : 35 Sets per Month
Delivery Time : 30 Working Days
Packaging Details : Standard Export Packing
Main Power : 7.5KW
Size : 7.5*1.2*1.0m
Weight : Approx. 8tons
Speed : 20-25m/min
Roller : 45# Steel, coated with hard chrome
Roller Station : 18 Stations
Durable And Stable Running Fully Automatic Door Frame Roll Forming High Efficiency
1. Description of Door Frame Roll Forming Machine
This Door Frame Roll Forming machine can produce various kinds of Roll Formed Aluminum & GI Steel Door or Window frames.
A door frame roll forming machine generally consists of a decoiler (a Hydraulic Decoiler is optional), a main roll forming unit, a transmission system, a cutting tool, a hydraulic system, a hydraulic oil pump, a PLC control cabinet, and run-out tables
Lebron-Machinery is manufacturing high-quality door frame machines, and they are mostly exported to foreign countries, such as India, Angola, Ethiopia, Ghana, Zambia, Brazil, Argentina, Thailand, Philippines, Pakistan, Russia, etc.
2. Technical Parameters of Door Frame Roll Forming Machine
No. | Item | Description |
1 | Suitable Plate Material | Thickness: 0.8-1.5mm, Galvanized steel coil |
2 | Working Speed | 12-15 m/min |
3 | Roller quantity | 18 rollers |
4 | Material of Roller | Gcr15, Quench HRC58-62 Plated Chrome |
5 | Material of Shaft | 45# Advanced Steel (Diameter: 76mm), thermal refining |
6 | Driven system | Chain drive |
7 | Main Power with reducer | 7.5KW |
8 | Cutting model: | Hydraulic Cutting Cr12mov |
9 | Material of Cutting blade | Cr12Mov, Quench HRC58-62 |
10 | Hydraulic Station Power | 4.0 KW |
11 | Operation system | Controlled by industry computer-PLC system. |
12 | PLC brand | Siemens with Japan English and Chinese Language |
13 | Touch Screen | Siemens Japan |
14 | Encoder | Omron, Japan |
15 | Electric parts | Schneider |
3. Main components of Door Frame Roll Forming Machine
Name | Quantity |
Uncoiler | 1set |
Coil sheet guiding device | 1set |
Main roll forming system | 1set |
Punching device | 1set |
Cutting device | 1set |
Hydraulic station | 1set |
PLC control system | 1set |
Support table | 1set |
4. Our Service
Installation service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if the buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
5. FAQ
Q: How to maintain it?
A: If used frequently, best coating lubricant on the chain and two ends of the shaft every month, replace the hydraulic oil every 1-2 years.
Q: Can you be responsible for transport?
A: Yes, please tell me the destination port or address. we have rich experience in transport.
Q: Can you make the machine according to my design or phototype?
A: Yes. We have an experienced team for working out the most suitable design and production
Q: Can you supply the raw materials?
A: Yes, we can supply the galvanized steel coil, aluminum steel coil, color steel coil
Q: How is this machine's service life?
A: In normal maintenance, the service life is at least 10 years.
![]() |
Stable Running Door Frame Roll Forming High Efficiency Fully Automatic Images |